Full Text
EXTRAORDINARY
PART II —Section 3 —Sub-section ( i)
PUBLISHED BY AUTHORITY
No. 420] NEW DELHI, FRIDAY, JULY 21, 2023/ASHADHA 30, 194 5
CG-DL-E-21072023-247503
MINISTRY OF RAILWAYS
(Railway Board)
NOTIFICATION
New Delhi, the 10th July, 2023
G.S.R . 526 (E).—In exercise of the powe rs conferred by clause (g) of sub -section (2) of section 60, read with
section 198 of the Railways Act, 1989 (24 of 1989), the Central Government hereby makes the following rules further
to amend the Indian Railways (Open Lines) General Rules, 1976 , namely :-
1. Short title and commencement. —(1) These rules may be called the Indian Railways (Open Lines) General
(Amendment) Rules, 2023.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. In the Indian Railways (Open Li nes) General Rules, 1976, (hereinafter referred to as said rules), for rule
5.16, the following rule shall be substituted, namely: -
“5.16 Shunting during reception of trains - When signals have been taken ‘off’ for an incoming train on to a
line which is not isolated, no shunting movement shall be carried out towards points over which the incoming
train is to pass except under special instructions for identified stations where frequent shunting movements
take place, and where such points are protected by a Stop Signal or by a Shunt Signal with the precautions to
be observed while performing shunting that -
a) shunting shall be carried out under supervision of authorised competent railway servant; and
b) rake or load should be fully on air brake; and
c) the m aximum speed during shunting operations shall not exceed 15 kmph”
3. In the said rules, in rule 8.05, for sub -rule (3), the following sub -rule shall be substituted, namely: -
“8.05 (3) When signals have been taken ‘off’ for an incoming train on to a line wh ich is not isolated, no
shunting movement shall be carried out towards points over which the incoming train is to pass except as
permitted by rule 5.16 of these rules.”
4. In the said rules, in rule 8.10, for sub -rule (2), the following sub -rule shall be substituted, namely: -
“8.10 (2) When signals have been taken ‘off’ for an incoming train on to a line which is not isolated, no
shunting movement shall be carried out towards points over which the incoming train is to pass except as
permitted by rule 5.1 6 of these rules.”
[F.No. 2021/Safety(A&R)/19/49]
JAYA VARMA SINHA , Member (O & BD) and Ex -Officio Secy .
Note:—The prin cipal rule s were published in the Gazette of India Extrao rdinary, Part -II, Section 3, Sub -section (i)
vide number G.S.R. 445(E), dated the 21st July, 1981 and were last amended vide number G.S.R. 603(E)
dated 27th July, 2022.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi -110064
and Published by the Controller of Public ations, Delhi -110054.
Login to read full text