Gazette Tracker
Gazette Tracker

Core Purpose

The Ministry of Railways notifies two Road Over Bridge construction projects on the Gadag-Hotgi Section in Bagalkot district, Karnataka, as 'Special Railway Projects' under clause 37(A) of Section 2 of the Railways Act, 1989.

Detailed Summary

In exercise of the powers conferred by clause 37(A) of Section 2 of the Railways Act, 1989 (Act No. 24 of 1989), the Ministry of Railways notifies that two projects in Karnataka are "Special Railway Projects" for providing national infrastructure for a public purpose, effective from the date of publication in the Official Gazette. The first is the proposed construction, on the Gadag-Hotgi Section, of a Road Over Bridge in lieu of Level Crossing No. 41 — a 1x30.00-metre railway span with a Bow String Girder and approach spans of (2x18.46m+2x18.46m) Pre-Stressed Concrete Girders with U-trough retaining walls, at Km 80/600-700 on the Sankeshwar–Kudalasangama Road (State Highway-44), in Keludi village, Guledagudda taluk, Bagalkot district. The second is the construction, on the same section, of a Road Over Bridge in lieu of Level Crossing No. 34 — a 1x60.00-metre railway span with a Bow String Girder and approach spans of (3x18.46m+3x18.46m) Pre-Stressed Concrete Girders with U-trough retaining walls, at Km 67/600-700 on the Bagalkot–Badami Road (State Highway-57), in Adagal village, Badami taluk, Bagalkot district. The notification is signed by Pardeep Puri, Chief Engineer/Construction, Bengaluru Cantonment, South Western Railway, dated 16th April 2025, S.O. 1763(E).

Full Text

CG-KA-E-19042025-262529 EXTRAORDINARY PART II—Section 3—Sub-section (ii) 2577 GI/2025 (1) MINISTRY OF RAILWAYS NOTIFICATION New Delhi, the 16th April, 2025 S.O. 1763(E).—In exercise of the powers conferred under clause 37(A) of Section 2 of the Railways Act, 1989 (Act no. 24 of 1989), the Ministry of Railways, Government of India, hereby notifies that the projects mentioned in the table below are “Special Railway Project” in the State of Karnataka for providing National Infrastructure for a Public Purpose with effect from the date of publication of the notification in the Official Gazette. | Sl. No. | Name of the Project | Village | Taluk | District | |---|---|---|---|---| | 1. | Gadag - Hotgi Section - Proposed Construction of Road Over Bridge in Lieu of Level Crossing No. 41, measuring 1x30.00m long Railway span with Bow String Girder including approaches with (2x18.46m+2x18.46m) Pre- Stressed Concrete Girder spans + U-troughs Retaining wall at Km: 80/600-700 on Sankeshwar - Kudalasangama Road (State Highway - 44). | Keludi | Guledagudda | Bagalkot | | 2. | Gadag - Hotgi Section - Construction of Road Over Bridge in lieu of LC No. 34, measuring 1x60.00m long Railway span with Bow String Girder including approaches with (3x18.46m+3x18.46m) Pre-Stressed Concrete Girder Spans + U-troughs Retaining wall at Km: 67/600-700 on Bagalkot - Badami Road (State Highway - 57). | Adagal | Badami | Bagalkot | PARDEEP PURI, Chief Engineer/Construction Bengaluru Cantonment, South Western Railway and Published by the Controller of Publications, Delhi-110054. SARVESH KUMAR SRIVASTAVA KUMAR SRIVASTAVA Date: 2025.04.19 16:43:39 +05'30'

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free