Gazette Tracker
Gazette Tracker

Core Purpose

The Central Government levies a toll fee for the use of the Bilaspur to Urga section of National Highway No. 130A in Chhattisgarh and authorises the National Highways Authority of India to collect it.

Detailed Summary

By notification S.O. 4682(E), dated 24th August 2026, issued under section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, the Central Government levies a fee on the four-or-more-lane Bilaspur to Urga section, from Km 0.000 to Km 70.200, of National Highway No. 130A in Chhattisgarh, and authorises the National Highways Authority of India to collect it, either directly or through a contractor. This National Highway had earlier been entrusted to the State Government of Chhattisgarh under section 5 of the National Highways Act, 1956, by notification S.O. 4531(E) dated 18th December 2019. The fee is levied at the 2007-08 base rates in Table 1 (from Rs. 0.65 per km for cars, jeeps, vans and light motor vehicles to Rs. 4.20 per km for oversized seven-or-more-axle vehicles), for a net road length of 68.086 km, collected at seven fee/ramp plazas located at Km 18+950 (village Sankar, Janjgir district, main toll plaza), Km 28+140 and Km 29+100 (village Charpara, Janjgir district), Km 53+470 (village Gumiya, Korba district), and Km 62+680, Km 63+210 and Km 69+850 (villages Urga and Chitapali, Korba district), with the fee for each vehicle calculated from the distance actually travelled between entry and exit plazas. Structures over 60 metres long, totalling 2.114 km in actual length, are converted to an equivalent 21.14 km of road length using an equalisation factor of 10. Multiple-journey passes are available at one-and-a-half times the one-way fee for two journeys within 24 hours, or two-thirds of the fifty-journey fee for fifty journeys within one month. The estimated capital cost of the project is Rs. 2523.86 crore, subject to variation pending completion of land acquisition, utility shifting and tree cutting. The notification is issued under File No. BM-14/2/2024-PIU Bilaspur (E-262666).

Full Text

CG-DL-E-25082026-275731 EXTRAORDINARY PART II—Section 3—Sub-section (ii) 6521 GI/2026 (1) MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 24th August, 2026 S.O. 4682(E).— Whereas by the notification of the Government of India in the Ministry of Road Transport and Highways number S. S.O. 4531(E) dated the 18th December, 2019 issued under section 5 of the National Highways Act 1956 (48 of 1956), the Central Government has entrusted the new National Highway No. 130A situated within the State of Chhattisgarh, to the State Government of Chhattisgarh. Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the “rules”), the Central Government hereby levies the fee at the rate specified in column (2) of Table-1 for net road length of 68.086 km and for equivalent structure length (having length more than 60 m) of 21.14 km (actual length of structures being 2.114 km), on the type of vehicles specified in column (1) of Table-1 below, for use of four or more lane section of the Bilaspur to Urga Section from kilometre 0.000 to kilometre 70.200 of National Highway No. 130A in the State of Chhattisgarh, and authorizes the National Highways Authority of India to collect, either through its officials or through a contractor, the said fee, namely:- | Table-1 | | |---|---| | Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees) | | (1) | (2) | | Car, Jeep, Van or Light Motor Vehicle | 0.65 | | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | | Bus or Truck (Two Axles) | 2.20 | | Three-axle commercial vehicles | 2.40 | | Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) | 3.45 | | Oversized Vehicles (seven or more axles) | 4.20 | 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza(s) namely: - | Table-2 | | | |---|---|---| | Location of Fee Plaza (chainage) | Length (in km) for which fee is payable | Rate at which fee is payable | | At Km/Ch. 18+950 of NH-130A near village Sankar in Janjgir District of State Chhattisgarh (Both Sides on MCW) | As per the distance matrix in Table3 below | 100% of the base rates mentioned in Table-1 above | | At Km/Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh (LHS + RHS on SR) | | | | At Km/Ch. 29+100 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh (LHS + RHS on SR) | | | | At Km/Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh (LHS + RHS on SR) | | | | At Km/Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh (LHS + RHS on SR) | | | | At Km/Ch. 63+210 of NH-130A near village Urga in Korba District of State Chhattisgarh (LHS + RHS on SR) | | | | At Km/Ch. 69+850 of NH-130A near village Chitapali in Korba District of State Chhattisgarh (LHS + RHS on SR) | | | | Table-3 | | | | Distance matrix for net road length (excluding Structures of length more than 60 m) | | | | S.No. | From | At Km/Ch . 18+950 o f NH-130 A near vill age Sanka r in Janjgir District of State Chh attisgarh ( Both Side s on MC W) | At Km/ Ch. 28+ 140 of NH-130 A near village Charpar a in Janj gir Distr ict of St ate Chh attisgar h (LHS + RHS on SR) | At Km/Ch. 29+100 of NH-130A near village Charpara in Janjgir Dist rict of State Chhattisgar h (LHS + R HS on SR) | At Km/Ch. 53+470 of NH-130A near villag e Gumiya i n Korba Di strict of St ate Chhatti sgarh (LH S + RHS o n SR) | At Km/Ch. 62+680 of NH-130A near villag e Urga in Korba Dist rict of Stat e Chhattisg arh (LHS + RHS on SR) | At Km/Ch . 63+210 of NH-13 0A near v illage Urg a in Korb a District of State C hhattisgar h (LHS + RHS on S R ) | At Km/Ch. 69+8 50 of NH-130A n ear village Chitap ali in Korba Distr ict of State Chhatt isgarh (LHS + R HS on SR) | |---|---|---|---|---|---|---|---|---| | 1 | At Km/Ch. 18+950 of NH-130A n ear village Sankar in Ja njgir Distric t of State C hhattisgarh (Both Sides on MCW) | 0 | 27.366 | 28.326 | 52.696 | 60.891 | 61.271 | 68.086 | | 2 | At Km/Ch. 28+140 of NH-130A n ear village Charpara in Janjgir Dist rict of State Chhattisgar h (LHS + R HS on SR) | 27.366 | 0 | 0.960 | 25.330 | 33.525 | 33.905 | 40.720 | | 3 | At Km/Ch. 29+100 of NH-130A n ear village Charpara in Janjgir Dist rict of State Chhattisgar h (LHS + R HS on SR) | 28.326 | 0.960 | 0 | 24.370 | 32.565 | 32.945 | 39.760 | | 4 | At Km/Ch. 53+470 of NH-130A near villag e Gumiya i n Korba Di strict of St ate Chhatti sgarh (LH S + RHS o n SR) | 52.696 | 25.330 | 24.370 | 0 | 8.195 | 8.575 | 15.390 | | 5 | At Km/Ch. 62+680 of NH-130A n ear village Urga in Kor ba District o f State Chha ttisgarh (LH S + RHS on SR) | 60.891 | 33.525 | 32.565 | 8.195 | 0 | 0.380 | 7.195 | |---|---|---|---|---|---|---|---|---| | 6 | At Km/C h. 63+21 0 of NH- 130A nea r village Urga in Korba Di strict of S tate Chha ttisgarh ( LHS + R HS on S R) | 61.271 | 33.905 | 32.945 | 8.575 | 0.380 | 0 | 6.815 | | 7 | At Km/ Ch. 69 +850 of NH-13 0A nea r villag e Chita pali in Korba District of State Chhatti sgarh ( LHS + RHS o n SR) | 68.086 | 40.720 | 39.760 | 15.390 | 7.195 | 6.815 | 0 | 2. In addition to the above, the following fee shall also be due and payable for the use of the following structures having length more than 60 m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10:- | Table-4 | | | | |---|---|---|---| | Location of Fee Plaza (chainage) | Length of structures (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable | | (1) | (2) | (3) | (4) | | At Km/Ch. 18+950 of NH-130A near village Sankar in Janjgir District of State Chhattisgarh (Both Sides on ML) | As per the distance matrix for structures of length more than 60 m at Table- 5 below | 10 times of the distance matrix for structures at Table-5B below | 100% of the base rates mentioned in Table-1 above | | At Km/Ch. 28+140 of NH-130A near village Charpara in Janjgir | | | | | District of State Chhattisgarh (LHS + RHS on SR) | |---| | At Km/Ch. 29+100 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh (LHS + RHS on SR) | | At Km/Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh (LHS + RHS on SR) | | At Km/Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh (LHS + RHS on SR) | | At Km/Ch. 63+210 of NH-130A near village Urga in Korba District of State Chhattisgarh (LHS + RHS on SR) | | At Km/Ch. 69+850 of NH-130A near village Chitapali in Korba District of State Chhattisgarh (LHS + RHS on SR) | | Table-5 | | | | | | | | |---|---|---|---|---|---|---|---| | Distance matrix for road length of Structures* (length more than 60 m) between Fee Plazas | | | | | | | | | From / To | Km 18+950 | Km 28+140 | Km 29+100 | Km 53+470 | Km 62+680 | Km 63+210 | Km 69+850 | | Km 18+950 | 0 | 0.774 | 0.774 | 0.774 | 1.789 | 1.939 | 2.114 | | Km 28+140 | 0.774 | 0 | 0 | 0 | 1.015 | 1.165 | 1.34 | | Km 29+100 | 0.774 | 0 | 0 | 0 | 1.015 | 1.165 | 1.34 | | Km 53+470 | 0.774 | 0 | 0 | 0 | 1.015 | 1.165 | 1.34 | | Km 62+680 | 1.789 | 1.015 | 1.015 | 1.015 | 0 | 0.15 | 0.325 | | Km 63+210 | 1.939 | 1.165 | 1.165 | 1.165 | 0.15 | 0 | 0.175 | | Km 69+850 | 2.114 | 1.34 | 1.34 | 1.34 | 0.325 | 0.175 | 0 | * The details are as under:- | Table-5A | | | | |---|---|---|---| | Chainage | | Type of Structure | Length (in km) | | From Km | To Km | | | | 1+540 | 1+840 | Major Bridge | 0.300 | | 7+080 | 7+155 | Major Bridge | 0.075 | | 16+072 | 16+192 | Major Bridge | 0.120 | | 57+399 | 57+558 | Major Bridge | 0.159 | | 58+888 | 59+668 | Major Bridge | 0.780 | | 59+983 | 60+059 | Major Bridge | 0.076 | | 5+825 | 5+939 | ROB | 0.114 | | 63+850 | 64+025 | ROB | 0.175 | | 0+934 | 1+099 | Flyover | 0.165 | | 62+944 | 63+094 | Flyover | 0.150 | | Total | | | 2.114 | | Table-5B | | | | | Distance matrix for length of Structures (length more than 60 m) between Fee Plazas by multiply of 10 | | | | | | | | |---|---|---|---|---|---|---|---| | From / To | Km 18+950 | Km 28+140 | Km 29+100 | Km 53+470 | Km 62+680 | Km 63+210 | Km 69+850 | | Km 18+950 | 0 | 7.74 | 7.74 | 7.74 | 17.89 | 19.39 | 21.14 | | Km 28+140 | 7.74 | 0 | 0 | 0 | 10.15 | 11.65 | 13.4 | | Km 29+100 | 7.74 | 0 | 0 | 0 | 10.15 | 11.65 | 13.4 | | Km 53+470 | 7.74 | 0 | 0 | 0 | 10.15 | 11.65 | 13.4 | | Km 62+680 | 17.89 | 10.15 | 10.15 | 10.15 | 0 | 1.5 | 3.25 | | Km 63+210 | 19.39 | 11.65 | 11.65 | 11.65 | 1.5 | 0 | 1.75 | | Km 69+850 | 21.14 | 13.4 | 13.4 | 13.4 | 3.25 | 1.75 | 0 | 3. The net effective length (total tollable road length) for which fee shall be due and payable is as under:- | Table-6 (Table 3+Table 5B) | | | | | | | | |---|---|---|---|---|---|---|---| | From / To | Km 18+950 | Km 28+140 | Km 29+100 | Km 53+470 | Km 62+680 | Km 63+210 | Km 69+850 | | Km 18+950 | 0 | 35.106 | 36.066 | 60.436 | 78.781 | 80.661 | 89.226 | | Km 28+140 | 35.106 | 0 | 0.96 | 25.33 | 43.675 | 45.555 | 54.12 | | Km 29+100 | 36.066 | 0.96 | 0 | 24.37 | 42.715 | 44.595 | 53.16 | | Km 53+470 | 60.436 | 25.33 | 24.37 | 0 | 18.345 | 20.225 | 28.79 | | Km 62+680 | 78.781 | 43.675 | 42.715 | 18.345 | 0 | 1.88 | 10.445 | | Km 63+210 | 80.661 | 45.555 | 44.595 | 20.225 | 1.88 | 0 | 8.565 | | Km 69+850 | 89.226 | 54.12 | 53.16 | 28.79 | 10.445 | 8.565 | 0 | 4. The various types of traffic movement for which the user fee will be charged on the basis of distance travelled are as under: | Table-7A : Traffic plying on LHS from Bilaspur to Urga | | | | |---|---|---|---| | S.No. | Km | Entry From | Exit To | | (1) | (2) | (3) | (4) | | MCW Toll Plaza & Exit Ramp Plaza | | | | | 1 | At Km/Ch. 18+950 of NH-130A near village Sankar in Janjgir District of State Chhattisgarh (Both Sides on MCW) | Entry from Ch. 0.00 of NH-130A is recorded at Ch. 18+950 (MCW Toll Plaza). | Exit at Ramp Plaza @ Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | | | | | Exit at Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | | | | | Exit at Ramp Plaza @ Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh. | | | | | Exit @ Ch. 70+200 km i.e. end point. | | Ramp Plaza | | | | |---|---|---|---| | 2 | At Km/Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh | Entry from Ch. 0.00 of NH-130A. | Exit at Ramp Plaza @ Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | | 3 | At Km/Ch. 29+100 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | Entry Ramp Plaza @ Ch. 29+100 Km of NH-130A. | Exit at Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | | | | | Exit at Ramp Plaza @ Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh. | | | | | Exit @ Ch. 70+200 km i.e. end point. | | 4 | At Km/Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh | Entry from Ch. 0.00 of NH-130A. | Exit at Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | | | | Entry Ramp Plaza @ Ch. 29+100 Km of NH-130A. | | | 5 | At Km/Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh | Entry from Ch. 0.00 of NH-130A. | Exit at Ramp Plaza @ Ch. 62+680 of NH-130A. | | | | Entry Ramp Plaza @ Ch. 29+100 Km of NH-130A. | | | 6 | At Km/Ch. 63+210 of NH-130A near village Urga in Korba District of State Chhattisgarh | Entry Ramp Plaza @ Ch. 63+210 Km of NH-130A. | Exit @ Ch. 70+200 km i.e. end point. | | 7 | At Km/Ch. 69+850 of NH-130A near village Chitapali in Korba District of State Chhattisgarh | Entry Ramp Plaza @ Ch. 69+850 Km of NH-130A. | Exit @ Ch. 70+200 km i.e. end point. | | Table-7B : Traffic plying on RHS from Urga to Bilaspur | | | | |---|---|---|---| | S.No. | Km | Entry From | Exit To | | (1) | (2) | (3) | (4) | | MCW Toll Plaza & Entry Ramp Plaza | | | | | 1 | At Km/Ch. 18+950 of NH-130A near village Sankar in Janjgir District of State Chhattisgarh (Both Sides on MCW) | Entry from Ch. 70+200 of NH- 130A i.e. end point. | Exit @ Ch. 0.00 of NH- 130A. | | | | Entry from Ramp Plaza @ Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh. | | | | | Entry from Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | | | | | Entry from Ramp Plaza @ Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | | | Ramp Plaza | | | | | | At Km/Ch. 69+850 of NH- 130A near village Chitapali in | Entry from Ch. 70+200 of NH- 130A i.e. end point. | Exit Ramp Plaza @ Ch. 69+850 km of NH-130A. | | 2 | Korba District of State Chhattisgarh. | | | |---|---|---|---| | 3 | At Km/Ch. 63+210 of NH-130A near village Urga in Korba District of State Chhattisgarh | Entry from Ch. 70+200 of NH- 130A i.e. end point. | Exit Ramp Plaza @ Ch. 63+210 km of NH-130A. | | 4 | At Km/Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh | Entry from Ramp Plaza @ Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh. | Exit Ramp Plaza @ Ch. 29+100 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | | | | | Exit from Ch. 0.00 of NH- 130A. | | 5 | At Km/Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh | Entry from Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | Exit Ramp Plaza @ Ch. 29+100 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | | | | | Exit @ Ch. 0.00 of NH- 130A. | | 6 | At Km/Ch. 29+100 of NH- 130A near village Charpara in Janjgir District of State Chhattisgarh | Entry from Ch. 70+200 of NH- 130A i.e. end point. | Exit Ramp Plaza @ Ch. 29+100 km of NH-130A. | | | | Entry from Ramp Plaza @ Ch. 62+680 of NH-130A near village Urga in Korba District of State Chhattisgarh. | | | | | Entry from Ramp Plaza @ Ch. 53+470 of NH-130A near village Gumiya in Korba District of State Chhattisgarh. | | | 7 | At Km/Ch. 28+140 of NH- 130A near village Charpara in Janjgir District of State Chhattisgarh | Entry from Ramp Plaza @ Ch. 28+140 of NH-130A near village Charpara in Janjgir District of State Chhattisgarh. | Exit @ Ch. 0.00 of NH- 130A. | 5. The vehicle entering from any Main Toll Plaza/Ramp Plaza will be recorded at the entry fee plaza and user fee will be collected at Exit Ramp Plaza/Main Toll Plaza for the road section used by the vehicle between Exit & Entry fee plazas as per detailed mentioned under Sl. No.4. 6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:- | Table-8 | | | |---|---|---| | Amount Payable | Maximum number of one-way journeys allowed | Period of validity | | One and half times of the fee for one way journey | Two | Twenty-four hours from the time of payment | | Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment | * Provided that the user uses the same entry and exit fee plazas while performing the return journey. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in rule 10 of the said rules. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometre for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the National Highways Authority of India on the basis of the completed length of the section and revised annually in accordance with rule 5 of the said rules and the same shall be published in at least one newspaper each in English and the vernacular language. 11. The estimated capital cost of the project is Rupees 2523.86 crore. [Since the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed, the capital cost is subject to variation]. The National Highways Authority of India shall maintain a record of the recovery of capital cost through user fee realised. [F. No. BM-14/2/2024-PIU Bilaspur (E-262666)] and Published by the Controller of Publications, Delhi-110054. KUMER CHAND MEENA Digitally signed by KUMER CHAND MEENA Date: 2026.08.25 16:17:10 +05'30'

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free