Full Text
6709 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
(1) (2) (3) (4) (5) (6) (7)
1. 2024 -25 0.67% 0.38% 1.50% 27.35% 29.91%
2. 2025 -26 1.45% 1.22% 2.10% 28.24% 33.01%
No. 4438] NEW DELHI, FRIDAY , OCTOBER 20, 2023/ ASVINA 28, 1945
CG-DL-E-23102023-249637
4. 2027 -28 2.45% 1.42% 3.30% 31.64% 38.81%
5. 2028 -29 2.95% 1.42% 3.90% 33.10% 41.36%
6. 2029 -30 3.48% 1.33% 4.50% 34.02% 34.33%
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 20th October , 2023
S.O. 4617 (E).—In exercise of the powers conferred by clauses (n) and ( x) of section 14 of the Energy
Conservation Act, 2001 (52 of 2001), the Central Government in consultation with the Bureau of Energy Efficiency,
hereby specifies the minimum share of consumption of non -fossil sources (renewable energy) by designat ed
consumers as energy or feedstock and different share of consumption for different types of non -fossil sources for
different designated consumers in respect of electricity distribution licensee and other designated consumers who are
open access consumers or captive users to the extent of consumption of electricity from sources other than distribution
licensee as a percentage of their total share of energy consumption indicated in the Table below :
TABLE
Sl.No Year Wind
renewable
energ y Hydro
renewable
energy Distributed
renewable energy* Other
renewable
energy Total
renewable
energy
(1) (2) (3) (4) (5) (6) (7)
1. 2024 -25 0.67% 0.38% 1.50% 27.35% 29.91%
2. 2025 -26 1.45% 1.22% 2.10% 28.24% 33.01%
3. 2026 -27 1.97% 1.34% 2.70% 29.94% 35.95%
4. 2027 -28 2.45% 1.42% 3.30% 31.64% 38.81%
5. 2028 -29 2.95% 1.42% 3.90% 33.10% 41.36%
6. 2029 -30 3.48% 1.33% 4.50% 34.02% 43.33%
Note 1: *For hilly and North -Eastern States/Union Territories, namely Arunachal Pradesh, Assam,
Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura, Jammu & Kashmir, Ladakh,
Himachal Pradesh and Uttarakhand, the distributed renewable energy component shall be half
of that given in the Table and the remaining component for these States shall be included in
the other r enewable energy sources.
Note 2: The wind renewable energy component shall be met by energy produced from Wind Power
Projects (WPPs) commissioned after the 31st March, 2024.
Note 3: The hydro renewable energy component shall be met only by energy produce d from Hydro
Power Projects [including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)],
commissioned after the 31st March, 2024:
Provided that the hydro renewable energy component may also be met out of the free
power being provided to the S tate/DISCOM from the Hydro Power Projects commissioned
after the 31st March, 2024:
Provided further that the hydro renewable energy component may also be met from
Hydro Power Projects located outside India as approved by the Central Government on a case -
to-case basis.
Note 4: The distributed renewable energy component shall be met only from the energy generated
from renewable energy projects that are less than 10 MW in size and shall include solar
installations under all configurations (net metering, gros s metering, virtual net metering, group
net metering, behind the meter installations and any other configuration) notified by the
Central Government:
Provided that the compliance against distributed renewable energy shall ordinarily be
considered in terms of energy (Kilowatt hour units):
Provided further that in case the designated consumer is unable to provide generation
data against distributed renewable energy installations, the reported capacity shall be
transformed into distributed renewable energy gen eration in terms of energy by a multiplier of
3.5 units per kilowatt per day (kWh/kW/day).
Note 5: The other renewable energy component may be met by energy produced from any renewable
energy power project other than specified in Note 2, 3 and 4 and shall comprise energy from
all WPPs and Hydro Power Projects [including Pump Storage Projects (PSPs) and Small
Hydro Projects (SHPs)], including free power, commissioned before the 1st April, 2024.
2. Any shortfall in achievement of stipulated wind renewable en ergy consumption in a particular year may
be met with hydro renewable energy which is in excess of that energy component for that year and vice -
versa.
3. The balance excess energy consumption under wind renewable energy or hydro renewable energy
component in that year, may be considered as part of other renewable energy component.
4. Any excess energy consumption under Other renewable energy component in a particular year, may be
utilised to meet the shortfall in achievement of stipulated Wind renewable en ergy or Hydro renewable
energy consumption.
5. The designated consumers who are open access consumers or consumers with Captive Power Plants
shall fulfil their obligation as per the specified total renewable energy target irrespective of the non -fossil
fuel source.
6. The specified renewable energy consumption targets shall be met either directly or through Certificate
in accordance with the Central Electricity Regulatory Commission (Terms and Conditions for Renewable
Energy Certificates for Renewable Energ y Generation) Regulations, 2022, published in the Gazette of India,
Extraordinary, Part III, Section 4, dated the 24th May, 2022:
Provided that any shortfall in specified renewable energy consumption targets shall be treated as
non-compliance and penalty s hall be imposed as such rate specified under sub -section (3) of section 26 of
the said Act.
7. The Bureau shall maintain data related to compliance of renewable energy utilisation by the designated
consumer(s) and submit report to the Central Government.
8. This notification shall come into force on the 1st day of April, 2024 and till such time, the RPO
trajectory specified in paragraphs 5 to 14 vide the Ministry of Power Order No. 9/13/2021 -RCM, dated 22nd
July, 2022 read with Corrigendum, dated the 19th September, 2022, shall remain in force.
[F.No. 9/13/2021 -RCM ]
AJAY TEWARI , Add l. Sec y.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.