EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 4933] NEW DELHI, MONDAY, DECEMBER 4, 2023/AGRAHAYANA 13 , 194 5
CG-DL-E-05122023-250421
MINISTRY OF POWER
ORDER
New Delhi, the 1st December , 2023
S.O. 5 158(E).—Whereas M/s JSW Renew Energy Limite d, having its registered office at JSW Centre,
Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra – 400051, India, has applied for authorization under
Section 164 of the Electricity Act, 2003 for laying of overhead transmission line under “Transmission system for
providing connectivity to M/s JSW Renew Energy Limited for its 270 MW Wind Power Plant in Tiruppur, Tamil
Nadu”.
And whereas, Central Electricity Authority (CEA), Ministry of Power, Government of India vide its letter
CEA -PS-11-21/1/2021 -PSPA -I Division -I/25667/2023 dated 11.01.2023 had granted prior approval under section
68(1) of the Electricity Act, 2003 for the overhead line covered under “Transmission system for providing
connectivity to M/s JSW Renew Energy Limited for its 270 MW Wind Powe r Plant in Tiruppur, Tamil Nadu”.
M/s JSW Renew Energy Limited has published notice for transmission scheme in local newspapers Trinity
Mirror (in English) dated 11.05.2023, Dakshin Bharat Rashtramat (in Hindi) dated 01.05.2023, Makkaal Kural (in
Tamil) da ted 28.04.2023 and in Weekly Gazette of India dated 17.06.2023 for the general public to make
observations/representations on the proposed transmission route within 2 Months from the date of publication.
Subsequently, M/s JSW Renew Energy Limited has submi tted an affidavit dated 13.10.2023 declaring that no
observation/representation was received within 2 Months from the date of Publication in the official gazette of
Government of India.
And now the applicant has requested to confer upon him, all the power s under section 164 of the Electricity
Act, 2003, which the telegraph authority possess under the Indian Telegraph Act, 1885 with respect to the placing of
telegraph lines and posts for the purpose of a telegraph established or maintained by Government or to be so
established or maintained for laying of electric line under “Transmission system for providing connectivity to M/s
JSW Renew Energy Limited for its 270 MW Wind Power Plant in Tiruppur, Tamil Nadu”. The following overhead
line is covered under this scheme:
o 230 kV Single circuit line stringing on Double circuit tower from JSW Renew Energy Limited generation
switchyards to Karur PS (ISTS Substation).
The transmission line covered under the above scheme will pass through, over, around and between the
following villages, towns and cities of Tamil Nadu:
Name of Villages Tehsil District
Gurunathankottai, Yellappalaiyam, Otappalayam, Tottiyampalaiyam, Puliympatti,
Vattakkalivalasu, Sanarpalaiyam, Nattapalaiyam, Kulandaikavundanvalasu,
Valliyappankavundava lasu, Nainakavundanvalasu, Nainakavundanvalasu,
Periyannakavundanvalasu, Ayyampalaiyam, Kollapatti, Nochikattuvalasu,
Peramiyam, Illaiyampatti , Molakkavundanpudur, Kumarakavundanvalasu,
Kottaimulanu, Nallikavundanpalaiyam, Mallipatti, Pammipalaiyam,
Thulukkavalasu, Chinniyakavundanvalasu, kumaraswamikottai, M.Kollapatti,
Mambadi, Thurampadi, Vettukadu privu, Mettur colony, Vanjipalaiyam, Dharapuram Tiruppur
Tottampalaiyam, Nallikavundanpalaiyamcolony, Kumarrayyapalaiyam,
Mettupatti, Vanjivalasu, Kottaimulanurcolony, Uttama kavundanvalasu,
Karaivalasu, Parakkadai, Tulukkavalasu, Akkaraipalayam, Nadhampalayam.
Now, after careful consideration, Ministry of Power, Government of India, under section 164 of the Electricity
Act, 2003, confers all the powers to M/s JSW Renew Energy Limited for laying above overhead line, which telegraph
authority possesses under the Indian Telegraph Act, 1885 with respect to placing of telegraph lines and posts for the
purposes of a telegraph established or maintained, by Govern ment or to be established or maintained subject to
following terms and conditions for installing the above mentioned line, namely:
i. The approval is granted for 25 years.
ii. The Applicant shall have to seek the consent of the concerned authorities i.e., local b odies, Railways,
National Highways, State Highways etc. before erection of proposed line.
iii. The Applicant shall have to follow regulations/codes of the Appropriate Commission regarding transmission,
O&M, open access, etc., framed under Electricity Act, 2003.
iv. The Applicant shall operate the line after approval of Electrical Inspector / Chief Electrical Inspector of
Central Government.
v. The approval is subject to compliance of the requirement of the provisions of the Electricity Act, 2003 and
the rules made ther e under by the applicant.
vi. M/s JSW Renew Energy Limited shall have to submit the requisite clearances to Central Electricity Authority
after obtaining the same from concerned authorities like Civil Aviation, Defense etc., at the time of Electrical
Inspectio n.
[F. No. 25-16/25/2023 -PG]
M.V.N. VARA PRASAD, Under Secy. (PG)